Toggle menu
951-928-1508
  • LoginorSign Up
  • 0
Pet Play Products
×
×

    Shop By Category

  • Apparel
  • Nature's Farmacy
  • Beds, Crates & Mats
  • Grooming Supplies
    • Grooming Supplies
    • Chalks & Whiteners
    • Grooming Tables, Arms & Nooses
    • Hair Sprays
    • Grooming Tools
    • Mousse and Styling Gels
    • Shampoos and Conditioners
    • Silk and Shine
  • Health and Wellness
  • Leashes & Collars
    • Leashes & Collars
    • Biothane
    • Leather
    • Nylon & Paracord
    • Show Chains
    • Training Chains and Collars
  • Play Frames
  • Puppy Focused
  • Set-up Supplies
  • Toys
    • Toys
    • 2 for $30 or $18 each
    • 3 for $12 or $4.95 each
    • Balls, Squeakers & Bells
    • Bottle Toys
    • Float and Fetch Toys
    • Hanging Toys
    • Hide A Treat
    • Latex Toys
    • Oomaloo Toys
    • Plush Toys
    • Small Toys for Small Dogs
    • Stronger Toys
  • Treats and Bait Bags
  • Shop By Brand

  • Natures Farmacy
  • Pet Play Products
  • #1 All Systems
  • Bio-Groom
  • Auburn Leathercrafters
  • Kong
  • Boss PetEdge
  • Tropiclean
  • Outward Hound
  • Jollypet
  • Multipet
  • Resco
  • Wahl
  • All Valley
  • Chris Christensen
  • Crown Royale
  • Nylabone
  • View all Brands
  • Content Pages

  • About Us
  • 2023 Show Schedule
  • Shipping & Returns
  • Customer Testimonials
  • Apparel Swatches
  • Contact Us
  • User Navigation

  • LoginorSign Up
×
  • About Us
  • 2023 Show Schedule
  • Shipping & Returns
  • Customer Testimonials
  • Apparel Swatches
  • Contact Us
  • Home
  • Leashes & Collars
  • Biothane
  • Biothane Viper Long Lead
  • Biothane Viper Long Lead
  • Biothane Viper Long Lead

    Biothane Viper Long Lead

    MSRP:
    Now: $45.00
    (You save )

    Adding to cart… category.add_cart_announcement
    Add to Wish List
    • Create New Wish List

    Share This Article

    • Overview

    Product Description

    The lead is also available in 15 feet, 20 feet, and 33 feet lengths.

    Biothane Working Leads are created from a high-quality Biothane waterproof coated webbing. Biothane has a flexible substrate core that is bonded with a durable waterproof coating for protection. It is durable, cleanable, and has proven durability in applications where safety, cleanability, flexibility, and strength are crucial. It will not get stiff during extreme cold and will not melt during extreme heat. Super Heavy Biothane webbing has up to 750 lbs of breaking strength.

    This robust webbed dog lead is specially coated to emerge from even the swampiest environments, dry and smell-free, without loss of flexibility. !!! NOT A CHEW PROOF MATERIAL, NOT TO BE USED FOR TIE OUT !!!

    Solid brass hardware is ideal for working dogs in law enforcement or military operations. Will not rust.

    We stock a few colors and sizes but all are available by special order.  Please allow 4 weeks for delivery on special orders.

     

    Product Videos

    Custom Field

    Product Reviews

    ×

    Recommended

    • Biothane Viper Working Leash Biothane Viper Working Leash
      Quick view Details

      Biothane Viper Working Leash

      MSRP:
      Now: $30.00
      Choose Options
    • Micro Paracord Snap Lead Micro Paracord Snap Lead
      Quick view Details

      Micro Paracord Snap Lead

      MSRP:
      Now: $30.00
      Choose Options
    • Quick view Details

      Pet Play Products

      Braided Kangoo Show Leads

      MSRP:
      Now: $70.00
      Choose Options
    • Micro Paracord Kindness Lead Micro Paracord Kindness Lead Micro Paracord Kindness Lead Micro Paracord Kindness Lead
      Quick view Details

      Micro Paracord Kindness Lead

      MSRP:
      Now: $35.00
      Choose Options
    ×

    Join Our Mailing List for special offers!


    Contact Us

    PO Box 1149
    Sun City, CA 92585

    Account

    • Wishlist
    • Login or Sign Up
    • Shipping & Returns

    Navigate

    • About Us
    • 2023 Show Schedule
    • Shipping & Returns
    • Customer Testimonials
    • Apparel Swatches
    • © Pet Play Products |
    • Sitemap |
    • Premium BigCommerce Theme by Lone Star Templates